Construction of a manufacturing facility for electric vehicle batteries for Panasonic Energy in De Soto, Kansas (United States)
Construction of a multifunctional hall at the Brno exhibition centre, Czech Republic
Construction of a new building for the University of Michigan College of Pharmacy in Ann Arbor (United States)
Construction of a student housing at the University of Fraser Valley in British Columbia (Canada)
Construction of an eighteen story Core & Shell office tower in the Central Business District of Philadelphia (United States)
Construction of 525 rental housing units in 4 blocks in the Medina de Cuatro Vientos, Madrid (Spain)
Construction of the new Museum of Prehistory and Achaeology of Cantabria (MUPAC) in Santander (Spain)
Construction of a 7,000 m2 plant for MealFood Europe in Salamanca (Spain)
Construction of the extension of 2 new wings of the Hospital Universitario de Santiago in La Coruña, Galicia (Spain)
Construction of a building with 184 dwellings in Zaragoza (Spain)
Construction of 142 housing units in two blocks in Alcalá de Henares, Madrid (Spain)
Construction of 51 dwellings in 3 modules in Estepona, Málaga (Spain)
Modernization and expansion of the Federal Reserve Bank of Atlanta's Miami Branch, Florida (United States)
Construction of 9 additional floors of an office building in New York (United States)
Construction of a 325,000 sq-ft vitamin gummy production manufacturing facility located in New Albany, Ohio (United States)
Redevelopment of the One Times Square Experience Center in New York (United States)
Reconstruction and refurbishment of offices and premises of the Estel building in Barcelona (Spain)
Construction of a biological containment level 4 laboratory in Madrid (Spain)
Construction of the Llano de la Pasiega industrial complex on the Santander-Torrelavega axis in Cantabria (Spain)
Construction of 96 dwellings in "Colinas del Limonar" in Malaga (Spain)
Demolition and rehabilitation of the existing hotel in Fomento Street, Madrid (Spain)
Construction of 119 semi-detached dwellings in the Balearic Islands (Spain)
Construction of two buildings at Offutt Air Base outside Omaha, Nebraska (United States)
Construction of a new 5-story tower adjacent to the existing Westchester Medical Center (WMC) in New York (United States)
Construction of a luxury residential project known as The Presidential comprising 728 apartments in Gurgaon (India)
Construction of 4 buildings at the Rota militar base, Cádiz (Spain)
Construction of a block with 104 dwellings in Santa Cruz de Tenerife, Canary Islands (Spain)
Construction of 152 dwellings in Tres Cantos, Madrid (Spain)
Construction of 152 dwellings divided into two buildings in Valencia (Spain)
Construction of a block with 114 dwellings in Palmas Altas, Seville (Spain)
Construction of a 6,500 sq-m campus for Meta, which includes several data centre buildings in Jeffersonville, Indiana (United States)
Construction of a 30,000 sq-m vitamin production plant located in New Albany, Ohio (United States)
Construction of an active pharmaceutical ingredient (API) manufacturing plant in Colorado (United States)
Construction of the Orlando Health Wiregrass Ranch Hospital in Wesley Chapel, Florida (United States)
Construction of a new 5-storey tower next to the existing Westchester Medical Center (WMC) in New York (United States)
Modernisation and expansion of the Federal Reserve Bank branch in Miami, Florida (United States)
Design and construction of New York’s first football stadium for the New York City Football Club (NYCFC) (United States)
Construction of the new Tennessee Titans stadium in Nashville (United States)
Pre-construction and construction services for a new state-of-the-art stadium, with a capacity of 60,000 seats, for the NFL’s Buffalo Bills in Orchard Park, New York (United States)
Partial demolition and reconstruction of the 54,000 sqm David Booth Memorial Football Stadium at the University of Kansas (United States)
Modernisation and refurbishment of two existing buildings in the United Nations Plaza built between 1975 and 1983, New York (United States)
Refurbishment and expansion of the Austin Convention Centre in Texas (United States)
Construction of a 62-storey, LEED-certified, mixed-use building in Atlanta, Georgia (United States)
Refurbishment of the Royal Prince Alfred Hospital (RPA) awarded to CPB Contractors by the New South Wales Government in Sydney (Australia)
Construction work for the refurbishment of the Nepean Hospital in New South Wales, Australia
Construction of a luxury residential project known as The Presidential, consisting of 728 flats in Gurgaon (India)
Engineering, building refurbishment and modernisation services for RAAF (Royal Australian Air Force) Townsville, Curtin and Learmonth Bases and other military facilities (Australia)
Refurbishment of the female barracks of the Northern Luzon Command (NOLCOM) of the Armed Forces of the Philippines
Construction of two buildings for the Frankfurt Judicial Centre, with a gross surface area of 38,500 square metres for EUR 3 million (Germany)
Construction of laboratories for three public sector clients in Kassel (Germany)
Construction of a multifunctional hall at the Brno Exhibition Centre (Czech Republic)
Construction of a campus with four independent data centres, with a capacity of 60 MW, in Warsaw (Poland)
Construction of the new Museum of Prehistory and Archaeology of Cantabria (MUPAC) in Santander (Spain)
Construction of a 7,000 sq-m plant for MealFood Europe in Salamanca (Spain)
Construction of a biological containment level 4 laboratory in Madrid (Spain)
Construction of a research centre (Czech Republic)
Construction of two new wings at the Hospital Universitario de Santiago (Spain)