ACS Group 37,56 -0,05%
IBEX 35 10.863,90 0,09%

Civil works

  • Contract to deliver the surface civil and alignment works for the Sydney Metro – Western Sydney Airport rail link between Orchard Hills and the new Western Sydney Airport Station (Australia)
  • Construction of the extension and remodeling of the railway yard and platforms and the passenger building at Chamartín Station (Madrid)
  • Renovation of 25 km of track and catenary on the line between Silla and Cullera (Valencia)
  • Adaptation to high speed (250km/h) of existing double track in operation between Alcázar de San Juan and Manzanares, in Iberian gauge (Ciudad Real)
  • New 2,485 m long single-track railway access for the Port of Seville for freight traffic (Seville)
  • Construction of a 16.2-mile light rail transit line that extends from Bethesda to New Carrollton, in Maryland (United States)
  • Expansion of line 11 of Metro de Madrid by adding 5 stations along 7 km between Plaza Elíptica and Conde de Casal, Madrid (Spain)
  • Construction of a new bridge crossing over the existing BNSF railway tracks, replacing the current "at grade crossing" for Los Angeles County Metropolitan Transportation Authority (United States)
  • New contract for the cleaning service of metro lines 2 and 3 in Barcelona (Spain)
  • Contract for the improvement and conditioning of the Madrid-Seville High Speed Line corridor in the section between Yeles and Guadalmez (Spain)
  • Extension of the access roads and remodeling of the Joaquín Sorolla station building in Valencia, Spain
  • Contract for the assignment of the main works of line 9 of the Barcelona subway (Spain)