Civil works
- Construction of the extension and remodeling of the railway yard and platforms and the passenger building at Chamartín Station (Madrid)
- Renovation of 25 km of track and catenary on the line between Silla and Cullera (Valencia)
- Adaptation to high speed (250km/h) of existing double track in operation between Alcázar de San Juan and Manzanares, in Iberian gauge (Ciudad Real)
- New 2,485 m long single-track railway access for the Port of Seville for freight traffic (Seville)
- Expansion of line 11 of Metro de Madrid by adding 5 stations along 7 km between Plaza Elíptica and Conde de Casal, Madrid (Spain)
- New contract for the cleaning service of metro lines 2 and 3 in Barcelona (Spain)
- Contract for the improvement and conditioning of the Madrid-Seville High Speed Line corridor in the section between Yeles and Guadalmez (Spain)
- Extension of the access roads and remodeling of the Joaquín Sorolla station building in Valencia, Spain
- Contract for the assignment of the main works of line 9 of the Barcelona subway (Spain)