1,03%
-0,65%
The main projects worked on in 2010 were:
• Development of a new model for studying new configurations for thermal electric solar power plants. (Cobra)
• Development of a pilot loop with new heat transfer fluids for solar thermal applications. (Cobra)
• ECOVE – Development of a management system for recharging electric vehicles. (ETRA Group)
• Design and development of a new electrical power supply process for high technology aerospace installations. (Cobra)
• Viability study for the design, construction and installation of offshore wind farms. Phase II. (Dossa)
• Analysis and optimisation of the processes involved in the life cycle of projects, as well as their organisation and integration by implementing PLM (Product Lifecycle Management): Phase II. (Dossa)
• Signing of a collaboration agreement with the Castile- La Mancha Energy Agency for the study of a system for energy storage by means of concrete. (Eyra)
• Multi-year R&D project for the design and production of prefabricated housing as a solution in cases of emergency and for social housing. (Makiber)
• Research into and development of prediction algorithms for adaptive regulation of interurban lighting systems. (Sice)