-2,29%
-1,18%
Contracts Awarded
- Functional adaptation of the A-334 highway on the section Serón to Huercal Overa in Almería for G.I.A.S.A.
- Construction of the alternative road of the CN-332 highway from Ondara and Vergel in Alicante.
- Construction of the West circumvallation of Jerez de la Frontera (Cádiz).
- Construction of a 9.2 km. stretch of the Condado de Treviño (Burgos) highway.
- Adaptation of the tunnel installations and environmental restoration works in the highway Montegut-Olot (Girona).
- Construction of the subsidiary road in the highway N-III direction to Madrid and two bridges over N-III and M-45 highways in Madrid.
- Construction of a 9 km. stretch of the Palencia-Fuentes de Valdepero highway.
- Construction of the Road 5 of the Ensanche de Vallecas (Madrid).
- Construction of a subsidiary road for freights in the Barajas airport in Madrid.
- Remodeling of the service lane on national motorway N-I between the M-30 and the M-40 highways.
- Third lane for TF-1 Motorway. Section: Santa Cruz de Tenerife-Güimar - Santa Cruz de Tenerife from 0 to 20400.Km.
- Arrangement highway GC-1. Section: Gran Canaria Airport (Gando) - Maspalomas.
- Southwest bypass around Salamanca. Section: Connection with the south part of the ring road of Salamanca between the Buenos Aires and the Montalvos junctions.
- Viñedos highway. Section: Toledo-Consuegra.
- Works in the toll road A-8 (Guipúzcoa).
- Access to Roquetas de Mar y Vicar. Subsection connection the motorway N-340. Junction Parador-Carretera Las Losas.
- Diversion in the road M-609 in Soto del Real (Madrid).
- Construction of the highway A-1 Darrington - Dishford (England).