Completed projects

  • Construction and maintenance of the installations overhead contact line and associated systems of the high-speed railway stretch between Albacete and Alicante and its subsequent maintenance for two years.
  • Contract for the maintenance service of the street lighting of Murcia.
  • Comprehensive maintenance of four coal-fired power stations in Galicia.
  • Contract for installation and maintenance of telephone, broadband services, voice, fibre and television networks for Movistar in various Spanish provinces.
  • Construction and maintenance of Natural Gas networks including the gas distribution network, emergency call-out service and industrial connections in different areas within Spain.
  • Contract for developing climate control installations, mechanics and control of the new data processing centre for the BBVA in Tres Cantos (Madrid).
  • Increasing the installed capacity of the Penamacor wind farm in Portugal.
  • Project for the construction of a drinking water treatment plant and supply networks in the regions of Agnita and Dumbrãveni (Romania).
  • Construction of a photovoltaic plant with 49.9 MW of installed capacity in West Raynham (United Kingdom).
  • Implementation of a 17 kilometres underground electric interconnection line between Moirans and Vinay (France).
  • Mechanical assembly work for the nitric acid plant owned by Yara Norge (Norway).
  • Maintenance of the street lights in Sofia, Bulgaria.
  • Control and security system installations in the tunnel under the Vistula river (Poland).
  • Rehabilitation and modernisation of packages 1 and 2 of the combined cycle in the Tula thermal electric plant, comprising two units of 275 MW of installed power each, which is located in the town of Tula de Allende in the state of Hidalgo (Mexico).
  • Contract for the execution of the engineering, supplies, civil works and assembly of the Transmission line in 500 kV between the Luziania and Pirapora 2 substations (400 km) in Brazil.
  • Turnkey project for execution of the Recka thermal generation plant of 182 MW in Peru.
  • Design, supply and construction of the Renace III hydroelectric project in Alta Verapaz (Guatemala).
  • EPC project for the construction of a 30 MW biomass power plant in San Pedro de Macoris, Dominican Republic.
  • Construction of the Larimar wind farm with installed capacity of more than 50 MW in Dominican Republic.
  • Construction and installation of the Nacome II photovoltaic park with an installed capacity of 50 MW in Honduras.
  • EPC project for the implementation of three photovoltaic plants of approximately 11 MW each in Panama.
  • Implementation of the drilling water treatment plant at Puerto Gaitán (Colombia).
  • Supply, installation and commissioning of the Tetra systems for providing coverage to the Collective Transport System (CTS) in Mexico DF.
  • Supply, installation and commissioning of an Intelligent Traffic System (ITS), electrical and electromechanical system (ventilation, fire-protection system and lighting) of the Gambetta tunnel in Lima (Peru).
  • Turnkey project for the construction of mineral handling units and infrastructures related to the bauxite mine belonging to Ma’aden Bauxite and Alumina Company in Saudi Arabia.
  • Design, supply, installation and commissioning of the control systems of the WestConnex M4-East tunnel (Australia).
  • Design, execution, commissioning and operation of the Ali Mendjeli Sewage Treatment Plant (Algiers).
  • Urban traffic regulation system in Casablanca (Morocco).
  • Projects for the installation of electrical systems in the Indian railway network.
  • Turnkey execution of the photovoltaic plant of Fukuroda, with installed capacity of 32 MW (Japan).
  • Contract for the engineering, supply, and construction of a fertiliser plant, more specifically, diammonium phosphate (DAP), producing 1.5 million tonnes per year, in the industrial city of Ras al Khair (Saudi Arabia).
  • Turnkey contract for the implementation of the “Ibn Sina” plastics plant in Saudi Arabia, with production capacity of 50,000 tonnes of polyoxymethylene. The scope of the work includes the engineering of details, purchase management, and construction of a polyoxymethylene (POM) plant, as well as the auxiliary and offsite services.
  • Project for the engineering, supply and installation of 10 reactors for different plants belonging to subsidiaries of the Sabic Group in Saudi Arabia.
  • Turnkey project for a 200-bed hospital and 24 relatives accommodation houses for healthcare staff (Angola).